What Costs Are Involved in Setting Up a Stone Crusher Plant in India?
זמן:
26 June 2021

Setting up a stone crusher plant in India involves various costs, including land acquisition, equipment procurement, infrastructure development, labor, and operational expenses. Here’s a breakdown of the major costs involved:
1. Land Cost
- Land Purchase or Lease:
- Land near industrial areas or where stone deposits are available may be expensive.
- The size of the land required depends on the scale of the plant (usually 1 to 5 acres).
2. ציוד ומכונות
- These are the core costs for a stone crusher plant:
- Primary Crusher (e.g., Jaw Crusher): ₹5 lakhs to ₹25 lakhs.
- Secondary Crusher (e.g., Cone Crusher or Impact Crusher): ₹10 lakhs to ₹50 lakhs.
- Vibrating Screen(s): ₹2 lakhs to ₹10 lakhs.
- Conveyor systems: ₹2 lakhs to ₹15 lakhs.
- Crushing Plant Accessories (e.g., Hopper, Dust Suppression Systems, etc.): ₹10 lakhs to ₹30 lakhs.
Total equipment cost may range from ₹30 lakhs for a small-scale setup to ₹1 crore for a medium-scale plant.
3. Infrastructure
- Foundation and Civil Works:
- Building foundations for equipment and administrative blocks.
- ₹5 lakhs to ₹20 lakhs based on plant size.
- Electricity Connection:
- Installation of high-tension transformers.
- Cost varies based on power requirement, ranging from ₹5 lakhs to ₹20 lakhs.
- Water Supply:
- For dust suppression and other operations (₹1 lakh to ₹5 lakhs).
- Office and Storage Space:
- For managing operations and storing output (e.g., crushed stone) and raw material.
4. עבודה וכוח עבודה
- Hiring skilled operators, supervisors, and laborers:
- Monthly salaries for 10 to 20 workers, depending on scale, can range from ₹1 lakh to ₹5 lakhs.
5. Licenses and Permissions
- Environmental Clearances:
- Required to address emissions, dust generation, and noise pollution.
- Mining or Excavation Permits:
- If procuring raw stone materials, a mining license is required.
- Other Government Approvals:
- GST registration, pollution board clearance, local panchayat permissions, etc.
- Legal and Consulting Fees: ₹1 lakh to ₹5 lakhs.
6. עלויות חומרי גלם
- If materials are sourced from mining, costs include quarrying and transportation.
- If raw stone is purchased, costs are based on tonnage.
7. Transport Costs
- Required for material (raw and finished product) transportation.
- Purchasing or leasing vehicles like trucks and dumpers may add significant costs (₹5 lakhs to ₹40 lakhs based on the number of trucks).
8. Working Capital
- Day-to-day operational costs for maintenance, diesel, lubricants, etc.
- Spare part replacements and repairs.
- Estimated at ₹5 lakhs to ₹10 lakhs initially.
Total Estimated Cost for Setting Up a Plant
- Small Scale (10–50 TPH): ₹30 lakhs to ₹50 lakhs.
- Medium Scale (50–100 TPH): ₹1 crore to ₹2 crores.
- Large Scale (150 TPH and above): ₹2 crores and above.
Note: Actual costs might vary depending on location, equipment quality, and other factors. Proper planning and feasibility studies are crucial before proceeding with the project.
Contact Us
Shanghai Zenith Mineral Co., Ltd. is a leading manufacturer of crushing and grinding equipment in China. With more than 30 years of experience in the mining machinery industry, Zenith has built a strong reputation for delivering high-quality crushers, mills, sand-making machines, and mineral processing equipment to customers around the world.
Headquartered in Shanghai, China, Zenith integrates research, production, sales, and service, providing complete solutions for aggregates, mining, and mineral grinding industries. Its equipment is widely used in metallurgy, construction, chemical engineering, and environmental protection.
Committed to innovation and customer satisfaction, Shanghai Zenith continues to advance in intelligent manufacturing and green production, offering reliable equipment and comprehensive after-sales service to help clients achieve efficient and sustainable operations.
website: https://www.chinagrindingmill.net
דוא"ל:אינפו@chinagrindingmill.net
וואטסאפ:+8613661969651