info@chinagrindingmill.net
+8613661969651
english En
Svenska 中文版 Hindi Spanska Franska Arabiska Bengali Ryska Portugisiska Indonesiska Urdu Tysk Japanesisk Swahili Turkiska Italienska Koreanska Vietnamesiska Tamil Punjabi Persiska (farsi) Thailändska Nederländska Polska Ukrainska Rumänska Grekiska Hebreiska Svenska Tjeckisk ungerska Danska Finska Norsk Malay in Swedish is "malaysiska". Tagalog (Filippinska) Gujarati Kannada Burmese in Swedish is "burmesisk". Amhariska Hausa Somaliska Joruba Zulu Afrikaans Nepali Singalesiska Khmer Lao Mongoliska Javanesiska Telugu Marathi Malayalam Uigurer
SHANGHAI ZENITH MINERAL CO.,LTD. SHANGHAI ZENITH MINERAL CO.,LTD.
  • Hem
  • Om
  • Produkter
    Mobilt krossverkStenkrossMaldovnarModulära krossarGruvutrustning
  • Fall
  • Lösningar
  • Bibliotek
  • Kontakt
  • CitatNu
  • Hem
  • Bibliotek
  • How to Obtain Environmental Clearance Certificates for Gujarat’s Mining and Crushing Units?

How to Obtain Environmental Clearance Certificates for Gujarat’s Mining and Crushing Units?

Tid: 22 April 2021

Obtaining an Environmental Clearance Certificate (ECC) for mining and crushing units in Gujarat involves following specific regulatory procedures mandated by the Ministry of Environment, Forest and Climate Change (MoEF&CC), Government of India, and the Gujarat State Pollution Control Board (GPCB). The process typically adheres to the Environmental Impact Assessment (EIA) Notification, 2006 (as amended), which provides a framework for granting environmental clearances.

Here is the step-by-step process for obtaining an ECC for mining and crushing units in Gujarat:

1. Understand Applicable Regulations

  • Identify the project type and category under the EIA Notification, 2006:
    • Mining and stone crushing activities typically fall under Category A or B, depending on the size and scale of operations.
    • Category A projects require clearance from the central MoEF&CC, while Category B projects are handled by the State Environment Impact Assessment Authority (SEIAA) of Gujarat.

2. Preparation of Documents

Prepare the following essential documents:

  • Application Form: Submit Form 1 and/or Form 1M (for minor minerals) as required by the EIA notification.
  • Pre-Feasibility Report (PFR): Include project details, location, operational plan, and anticipated impacts.
  • Environmental Impact Assessment (EIA) Report: For larger projects (Category A or B1), an EIA study must include a detailed analysis of environmental impacts and proposed mitigation measures.
  • Consent from Local Authorities: Obtain local-level clearances, if applicable.
  • Topographical Map: Share detailed maps showing the project area, surrounding terrain, and any environmentally sensitive zones.

3. Public Consultation

  • Category A and B1 projects require a public consultation process under the EIA notification. The District Collector facilitates public hearings to gather feedback from affected communities and other stakeholders.
  • Ensure public concerns raised during hearings are addressed in the final EIA report and mitigation plans.

4. Submission to SEIAA or MoEF&CC

  • Submit your proposal via the Parivesh Portal, an online platform designed to manage environmental clearance applications.
  • Upload all forms, reports, and documents to the portal.
  • Pay the requisite application fees as prescribed under environmental regulations.

5. Technical Scrutiny

The SEIAA for Gujarat will evaluate the proposal:

  • Expert Appraisal Committee (EAC)ellerState Expert Appraisal Committee (SEAC) reviews the technical details, environmental impacts, and mitigation strategies described in the application.
  • Additional queries or suggestions might be requested by the committee.

6. Approval or Rejection

  • After thorough examination, the ECC is either granted or rejected based on compliance and impact analysis.
  • If approved, you receive the clearance certificate with stipulated terms and conditions that must be adhered to during operations.

7. Compliance Post-Clearance

Once clearance is obtained:

  • Obtain consent under the Air Act, 1981, and Water Act, 1974 from the Gujarat Pollution Control Board (GPCB).
  • Install pollution monitoring systems and ensure regular compliance with the conditions outlined in the ECC.
  • Submit periodic compliance reports to the regulatory authorities.

Key Points to Note:

  • Minor mineral mining projects typically require a less rigorous process (Category B2), with simplified forms (Form 1M) and no comprehensive EIA.
  • Mining and stone crushing units near reserved forests, eco-sensitive zones, or protected areas may face additional scrutiny, and approvals from the Forest Department may be necessary.
  • Engaging an accredited environmental consultant registered with the MoEF&CC can simplify the process and ensure regulatory compliance.

For up-to-date details and changes to the process, consult the Gujarat SEIAA website or the MoEF&CC guidelines.

Contact Us

Shanghai Zenith Mineral Co., Ltd. is a leading manufacturer of crushing and grinding equipment in China. With more than 30 years of experience in the mining machinery industry, Zenith has built a strong reputation for delivering high-quality crushers, mills, sand-making machines, and mineral processing equipment to customers around the world.

Headquartered in Shanghai, China, Zenith integrates research, production, sales, and service, providing complete solutions for aggregates, mining, and mineral grinding industries. Its equipment is widely used in metallurgy, construction, chemical engineering, and environmental protection.

Committed to innovation and customer satisfaction, Shanghai Zenith continues to advance in intelligent manufacturing and green production, offering reliable equipment and comprehensive after-sales service to help clients achieve efficient and sustainable operations.

website: https://www.chinagrindingmill.net

E-post:info@chinagrindingmill.net

Whatsapp:+8613661969651

  • Tidigare: Which High-Performance Gravel Crushers Offer the Best ROI for Aggregate Producers?
  • Nästa: What Should Buyers Consider When Sourcing Jaw Crushers for Industrial Applications?

Huvudprodukter

MTM Medium-Speed Grinding Mill

MTM Medelhastighets Kvarn

MTM medelhastighetskvarn antar världsledande pulverbehandlingsteknik. Det är det ideala substitutet för traditionella kvarnar som Raymond...

Läs mer
LUM Ultrafine Vertical Mill

LUM Ultrafina Vertikalfräs

LUM Ultrafine Vertikal Slipmaskin samlar slipning, torkning, klassificering och transport som en helhet och tar upp lite plats.

Läs mer
VSI6X Sand Making Machine

VSI6X Sand Making Machine

VSI6X Vertikalaxlad Impactkross, även känd som VSI6X Sandtillverkningsmaskin, kan användas både för sandtillverkning och omformning...

Läs mer
XSD Sand Washer

XSD Sandtvättmaskin

XSD Sand Washer används i stor utsträckning för att rengöra material inom följande industrier: gruvdrift, mineraler, byggmaterial, cementblandningsstation...

Läs mer
XZM Ultrafine Grinding Mill

XZM Ultrafina Kvarn

XZM Ultrafine Grinding Mill används i stor utsträckning för produktion av superfina pulver. Den är lämplig för att mala mjuka eller medelhårda material...

Läs mer
Raymond Mill

Raymondmolla

Raymond-mölla är fördelaktig för energibesparing och miljöskydd. Den har hög bearbetningskapacitet, hög separations effektivitet och låg...

Läs mer
PEW Jaw Crusher

PEW Kross med djupt krosshuvud

PEW kross är utvecklad baserat på PE kross, men den är enklare att använda och har högre kapacitet.

Läs mer
B Series VSI Impact Crusher

B-serie VSI-slagkross

B Series VSI Impact Crusher är, vanligtvis känd som en sandtillverkningsmaskin, grunden för utvecklingen av B Deep-rotor...

Läs mer
MTW Trapezium Grinding Mill

MTW Trapezium Kvarn

MTW Euro-typ Trapezium-kvarn har många oberoende patent, såsom helhetsspetsväxeldrift, intern tunnoljefettning, bågformad...

Läs mer
HGM Series High Pressure Grinding Roller

HGM-serien Högtrycksslipvalsar

HPGR förbättrar avsevärt kapaciteten i krossystemet samtidigt som det minskar förbrukningen av el och stålkulor...

Läs mer

Projektfall

Såld till över 180 länder och regioner, och framgångsrikt hjälpt kunder att bygga många stenkrushonanläggningar.
Och de slutliga aggregaten används för att bygga motorvägar, järnvägar, flygplatser och byggnader, etc.
South Africa Manganese Ore Crushing Plant

Sydafrika Manganmalm Krossningsanläggning

1000t/h Sand & Gravel Crushing Plant for Hydropower Station

1000t/h Sand & Gravel Krossanläggning för Vattenkraftverk

Trinidad and Tobago 400TPH Sand Washing and Screening Plant

Trinidad och Tobago 400TPH Sandtvätt och Screeninganläggning

The Philippines 80TPH River Pebble Crushing Plant

Filippinerna 80TPH Flodsten Krossningsanläggning

Turkey Copper Ore Crushing Plant

Turkiet Kopparmalmskrossanläggning

300t/h Tunnel Spoil Crushing Plant for Hydropower Station

300t/h Tunnelavfallsslaggkrossanläggning för vattenkraftverk

200t/h Granite Crushing Plant for Hydropower Station

200t/h granitkrossningsanläggning för vattenkraftstation

Mexico 1200-1400TPH Magnetite Crushing Line

Mexiko 1200-1400TPH Magnetit Krossningslinje

SHANGHAI ZENITH MINERAL CO.,LTD.

Certifiering

  • CE
  • SGS
  • ISO
  • GOST

Kontaktinformation

  • Whatsapp:+8613661969651
  • E-post:info@chinagrindingmill.net
  • Webbplats:www.chinagrindingmill.net
  • Adress:Nr 1688, East Gaoke Road, Shanghai, Kina

Våra lösningar

50-100t/h Mjuk bergkrossanläggning
50-100t/h Hård Sten Krossningsanläggning
100-150t/h Mjuk Bergkrossningsanläggning
100-150t/h Hård Bergkrossningsanläggning
150-200t/h Mjuk Bergkrossningsanläggning
150-180t/h Hård Sten Krossningsanläggning

Fall

Ghana 100-120TPH Granit Bärbar Krossanläggning
Dubai 550t/h Kalksten Krossningsanläggning
Filippinerna 80TPH Flodgrus Krossningsanläggning
Turkiet Kopparmalmskrossanläggning

Resurser

Bibliotek
Vanliga frågor
Nedladdningar

Om oss

Copyright © 2025 SHANGHAI ZENITH MINERAL CO., LTD. Alla rättigheter förbehålls.